Check that all weight plates slide smoothly on the guide rods. Test the pulley system for smooth movement. III. Maintenance & Troubleshooting
This is the most critical phase of the DP Dual Trac 20 assembly. The "Dual Trac" system utilizes two primary cable runs to distribute resistance. The Top Cable (High Pulley / Lat Pulldown) Start at the front end of the overhead crossmember. dp dual trac 20 assembly instructions full
Slide the rubber bumper cushions onto the bottom of each guide rod. Check that all weight plates slide smoothly on
Lift the top crossmember frame piece and carefully position it over the vertical upright posts and the top of the weight guide rods. and structural pieces before starting.
Use the parts diagram from Sears Parts Direct to verify you have all bolts, nuts, cables, and structural pieces before starting.